Saturday, January 14, 2012

Jan 7-14 -- Assemble Left Wing Skeleton

The photos below show progress that is an accumulation of off and on work for quite a few days.

Primed all the ribs, then riveted them to the main and rear spars. Looks like the rivets on the trailing spar are backwards from what the plans recommend (manufactured head on the thinnest side to avoid rib distortion); however I squeezed rather than use a gun, and there is no sign of distortion.

Still just a few holes left to rivet.

Today my good friend Michael Beare stopped over to help drive rivets into the main spar. I started this part of the riveting solo last weekend; however the result was that at least half a dozen rivets needed to be drilled out. Completely different outcome with his help -- and he is experienced to boot!

Total Time: 10 hours

Monday, January 2, 2012

Jan 2 -- Left Wing Ribs

Enlarged all holes in ribs for both wings to accept bushings for the conduit (I caved -- going to run conduit). In fact, I added holes for a third conduit run to the pitot and aileron bell crank. Need power for pitot heat and the autopilot servo.

Then I assembled the left wing (excluding nose ribs) and match drilled the ribs to both the main spar and the rear spar. Then deburred and used Scotch-Brite to scuff the ribs up in preparation for priming. Took the lot outside and cleaned them up with Coleman Fuel.


One rib received primer -- just as it started raining. Am going to have to wait for a dry weekend day to finish that part.

Total Time: 5.5 hours

Sunday, January 1, 2012

Dec 31 - Jan 1, 2012 -- Work on Ribs

Slowing up to do some research, because all of the sudden I am being bit by lack of planning ahead. For example, it's time to have an autopilot servo; however I haven't even evaluated the various choices.

Also time to drill holes for wiring in the wings. Many people run a single conduit; however I am running at least two in order to keep electrically noisy runs (strobes) away from things like antennas. Also need to consider how to service the not-yet-selected autopilot servo, which will be mounted short of all the way out there in the wingtip. Ordered some bushings to install in the holes, drilled holes that are too small for the bushings (just in case they don't work out).

Should I even run conduit? It's made from material not allowed in certified planes, and frankly I just don't trust it not to cause issues. Won't wire laying loose in there chafe from vibration? Lots to decide. Soon.

So each rib now has two 3/4" holes. One key learning along the way: Unibit (the actual brand) bits rock. Harbor Freight knock-offs suck.

Finally, also created a tool to measure aileron alignment later.

Total Time: 5 hours

Tuesday, December 27, 2011

Dec 19-27 -- Rear Spar

Been working on the rear spar for days, yet it seemed so simple...

Initial challenge was priming parts outside in the dark. A total of five nights -- each time going back to touch up one more spot. Finally had some daytime on Dec 23rd when I came home early. Should have just waited :)

Then there was the matter of working on the plane while quite sick with a bad cold that made me woozy. Lesson learned: don't.

So I also managed to screw up a couple of parts, which I am now waiting for from Van's. These were installed and looked very nice indeed! Until I discovered (a) a missing row of dimples, and (b) that I has countersunk the wrong holes in the doubler. Oh well, now an expert at drilling out rivets...

These are the parts that are in the top of the lower right photo. New parts will be here in a day or two.

Total time: 6 hours

Sunday, December 18, 2011

Dec 18 -- Drill and Prime Rear Wing Spar Doublers

Hard to believe that it took all day to accomplish this, but it did. 9:30-5:30 to be precise, with a couple of breaks for things such as eating.

Shaped and match drilled the various doublers for the rear spar, with a oblong hole for the ailerons accounting for quite a bit of this time. Also dimpled and countersunk a number of holes.

Then used ScotchBrite to scuff the doublers and both rear spars. Had hoped to prime today; however by the time that I finished all of this, it was too dark outside to paint.

The result doesn't look a heck of a lot different than the previous post, does it?

In the end I decided that even a bad prime job was north of not even trying. So I set things up to prime where some light is afforded by the fixture on the front of the garage. Might have to touch up the front of the house if overspray "decorated" the garage door, but it's worth that amount of bother.

Total Time: 7 Hours

Saturday, December 17, 2011

Dec 17 -- Deburr Rear Wing Spar and Doublers

Deburred the rear spar channel (W-907A), doubler plate (W-907B), and all related doubler plates (W-907C, W-907D, and W-907E).

Total Time: 2 Hours

Friday, December 16, 2011

Dec 16 -- Final Nutplates on Main Spar

This is going to seem like a weird post because the only progress is 6 nutplates. However they were a Big Deal in terms of hassle.

For starters, the nutplates are on the drawing but I can't find any reference to them in the instructions. Other RV-9 blogs voice a similar concern. So hopefully they are installed correctly!

The countersink cage wouldn't fit into some corners, and I spent several days and trips to the store looking for creative workarounds. Then I found the tool. In my tool box! Doh... There's a photo of the bad boy below.

Also, some of those rivets look funky. However when I carefully checked them, they are actually just fine other than one that is countersunk 0.001" deep.

At any rate, we'll call this 3 hours of work, but that's a lie on the way low end of time wasted. Looks like it's on to the rear spar next.

Total Time: 3 Hours

Saturday, December 3, 2011

Dec -- Install Aileron Bellcrank Brackets & APEX Plates

This seems like such a small thing, but took a fair bit of work for the details. Installed the aluminum APEX parts to act both as a tie-down ring mount point, and also to hold the aileron bellcrank brackets.

Torqued all AN-3 bolts to 25 inch-pounds.

Total Time: 3 hours

Sunday, November 27, 2011

Nov 23-27 -- Install Nutplates

This is getting repetitive: installed more nutplates of varying sizes in varying locations, over a period of several days.

Unfortunately my attempt to drill holes for the Apex tiedown bars did not go well. The first one suffered from layout issues that made the holes off-center. Bottom line is that a ruler plus marking pen is simply inadequate for accuracy. Looking online, it appears that others pioneered this mistake well in advance of today.

On the second bar, I was able to produce a unique piece of art. The work scooted under the edge if the stop on the saw. Result: wrecked aluminum and broken tooth on the aluminum saw. Luckily the blade held together, so no amputations. Ordered a new blade, two new hunks of aluminum, and a beer.

BTW, for others building RVs, these apex plates can be ordered with the pain of tapping the hole already finished. See Cleaveland Tool's website.

Total Time: 3 hours

Sunday, November 20, 2011

Nov 19 -- Finish Nutplates for Fuel Tanks

Exciting, huh? Spent all day attaching a gazillion nutplates for the fuel tanks. Guess that's penance for having fun flying the Luscombe yesterday. But it does make for completion of one paragraph in the instructions!

Total Time: 7 hours

Thursday, November 17, 2011

Nov 17 -- More Holes

Tonight consisted of three tasks -- and I will be at these for quite some time.

First, I primed a bunch of nutplates. They are plain steel, so if anything ever needed priming in the Pacific Northwest, these nutplates would be at the top of the list. Note that the photo shows two types. I only used the flat (small) ones, but figured that I may as well prime some of each.

Then each center hole was drilled to 3/16" (instructions are very vague here), and the bottom of each hole was deburred.

Next up was to create a template piece of metal to use for testing countersink depths. The aluminum test piece is the same thickness as the tank skins (0.032"), and dimpled for a #8 screw.

I started installing nutplates, one or two at a time, and riveted them in place. The nutplate will sever to center the countersink bit.

Set up my new single-fluke bit and gingerly drilled to the correct depth, testing with just the screw and also with the metal template to make certain that all is correct. Think that I need to go just a touch deeper; however want someone else to look at my work first. Easy to drill deeper, but not so easy if the holes are too deep...

Total Time: 2 hours

Wednesday, November 16, 2011

Nov 16 -- Countersink Wing Spar

Tonight was Hole City. Counter-sank half of the holes in both of the wing spars (where the fuel tanks will bolt on). All this made possible by the arrival of new single-flute countersink bits, because the old ones were too dull to work. This countersink is sooo much nicer than the standard ones!

Building both wings at the same time, so overall progress will be faster due to efficiencies. Or at least that's the lie that I am telling myself.

Not much else to say, other than there are still lots of holes to work on!

Total Time: 1.5 hours

Saturday, November 12, 2011

Nov 12 -- Start Wing Spars

Big day in that the two wing spars, which had been leaning against the garage wall since last April, finally slid out of their plastic bags to join the project. They are supposed to be hung on a wing stand; however I am delaying that day until really needed, because the stands burn up a lot of real estate in the garage.

Once out, I also opened up the many hardware bags of rivets, screws, and fittings. Tucked each of them away in a wall-storage bin with clear plastic drawers. Hopefully the parts organization is logical enough to find the parts when needed later.

And finally the first couple of nutplate rivet holes were countersunk.

Below are photos that are mostly for the records -- and that show the hand-etched serial numbers of each spar.

Total Time: 7 Hours

Wednesday, November 9, 2011

Nov 9-11 -- Build a Rib Flange Straightening Tool

Tonight's mission is to build a straightening tool for the rib flanges. A video of the idea is here, and a fancier tool was found in a Van's Air Force forum post.

Well, "tonight" turned into three nights thanks to interruptions such as the family's Domain Controller crashing, a surprise launch of a new Amazon Web Services region, etc., etc. Nonetheless, the two photos below represent the tool. This puppy is slick, and initial tests indicate that I should save a ton of time on the wings. Just wish that I'd built it for the empennage ribs...

The base and wood immediately on top of the base are pine. All wood directly attached to the metal sidebars is maple from my scrap box. That maple was originally intended for new cabinets, but I know that you won't tell anyone!


Here's the bill of material, if you want to build your own:
  • 1 ea. 2x6, cut to 18" long
  • 1 ea. 2x4, cut to 10" long with an 11 degree undercut bevel on the "business end"
  • 1 ea 1x1-1/2 maple (or any hardwood). I cut mine to 16" and it could be longer. Also thing that a 2x2 might be sturdier -- this handle takes a lot of abuse
  • 1 ea 3" long block, made from the same maple stock. I used my biscuit jointer to insert a couple of wood biscuits and glue up a double-height block. Probably overkill, but I got to play with more toys that way.
  • 1 ea. 3/16x1x3ft Weld steel flat bar, purchased at Lowes and cut into 2 ea 10" lengths. OK, cut into 12" lengths and then shortened to 10" when I screwed up alignment on 1/4" holes in one end.
  • 2 ea. 1/4-20 x 2-1/2 bolts, also from Lowes Aircraft Supply. These are not aircraft grade bolts -- they just look like it.
  • Washers and self-locking nuts for the bolts. I managed to purchase 1/4-20 bolts and 28-TPI nuts. Like I said, Lowes is not aircraft grade -- and mixing things up like they did was annoying. Fortunately I had nuts on hand.

Total Time: 2.5 hours (not counting going to Lowes to find a hunk of steel).

Tuesday, November 8, 2011

Nov 8 -- Deburr Wing Ribs

Tonight was straightforward: Crack open a stack of wing ribs and de-burr the edges on them.

Still need to de-burr all the rivet holes.

Total time: 1.5 hours

Sunday, March 27, 2011

Mar 25 -- Pick up Wing Kit

Does this time count towards building hours? :)

Picked up the Wing kit at Van's Aircraft, just south of Portland, OR. Went down the previous afternoon via Amtrak (bullet train from London to Paris could teach these dudes a few things...). Next morning I rented a U-Haul and picked up the wings for the drive back to Seattle.

Will leave the U-Haul saga out of this (executive summary: U-Haul #FAIL), other than to say that as the photo indicates, there was not much inside the truck. Needed a 17 ft truck in order to accommodate some long pieces such as fuselage longerons.

Once home I inventoried the loot over the weekend. Came up with some errors on Van's part, so it definitely pays to spend the time looking thru the kit. Going to be a while before these parts get used: still need to finish the empennage, and the reality of business travel is also setting me back.

One great delay though: NASA invited me to a Shuttle launch in April. I'll be one of 100 people at a TweetUp. Can't wait!!!