This seems like such a small thing, but took a fair bit of work for the details. Installed the aluminum APEX parts to act both as a tie-down ring mount point, and also to hold the aileron bellcrank brackets.
Torqued all AN-3 bolts to 25 inch-pounds.
Total Time: 3 hours
Saturday, December 3, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment