Saturday, October 30, 2010

Oct 30 -- More Rudder Work

Been over a month since this blog was updated: the result of being in Europe for several weeks, followed by catching up with life. I did actually work on the project last weekend too; however that work consisted of drilling out the rivets that attached the rudder horn. I'd missed a couple of bunged-up rivets.


The last several days consisted of reworking those parts, plus adding a counterweight to the rudder. Had to relieve the edges of the lead weight just a bit to make it slide into place. Note in the photos that I also primed the counterbalance. Not certain that lead and aluminum set up galvanic action; however not interested in finding out the answer...


Time: 3 hours


Sunday, September 26, 2010

Sep 26 -- Rudder Horn

Not much building at the moment, because the day job is all consuming. Did get the rudder horn attached after both priming and a final coat of paint.


I was able to set solid rivets by using the longeron yoke in the rivet squeezer. Probably could of turned the bottom rivets around so that the shop head was inside the rudder horn; however this direction made both control and inspection much easier.


Time: 0.5 Hrs

Tuesday, September 7, 2010

Sep 6 -- More Countersinking and Priming

Not a whole lot to report for Labor Day: primed parts, a tad of riveting (doublers) and finished countersinking the trailing edge insert. Mostly a weekend with Patrick, as he starts his visit from Africa.

Time: 2 Hours

Sunday, September 5, 2010

Sep 5 -- Dimple, Prime, Countersink Rudder

The past couple of days represented quite a bit of progress on the rudder, but without major visible results simply because this assembly involves so much effort. I dimpled everything that requires dimpling (hopefully), and then primed a few parts. Need to go back to NAPA for another can of primer, though -- and am also considering whether I should powder coat the rudder horn and rudder horn brace. (More correctly, whether I should farm them out to a shop -- Harbor Freight powdercoat sucks.)

Finally, I clamped a piece of wood to the bench and match drilled it with the trailing edge angle aluminum. Then I started countersinking 3/32" holes in it -- in anticipation of riveting the rudder's trailing edge. The Net is full of various opinions about this particular issue, and I see that others are particularly concerned with making certain that the edge is straight and true. You'll be reading more about this as I continue.

All of the workshop time today was without the neck brace. Karin says that I seem to be hunching forward though, so it's back on again as I post this entry.

Time: 5 hours

Wednesday, September 1, 2010

Sep 1 -- More Rudder Construction

It's been three weeks since a blog post, with lots of non-building stuff in the middle (surgery, Patrick was ambushed in Namibia, Anna was not having the best of luck in Bolivia, I refinished the deck, etc...)

Nonetheless, I actually worked on the rudder! That includes the day I went in for surgery, the day after I came home, and a lot of other days. Think that the hours worked were much longer than stated below; however I lost track and never got around to blogging. Wearing a neck brace is a pain.

As usual, lots of plastic peeling involved...

I will let the photos speak for themselves. You can see where I had one issue with holes drilled too close to the edge of a trim strip. What you can't see is that I bought another part and promptly repeated the mistake.

Next up is deburring, dimpling, priming, and riveting the silly thing.

Time since last blog post: 8 hours

Sunday, August 8, 2010

Aug 8 -- Install Stiffeners on Other Rudder

Today's work on the plane was fairly limited. Used the rest of the Proseal and installed stiffeners on the other rudder skin.

Also squeezed in 0.4 hours in the Luscombe with a work mate (nasty weather precluded more), and a belated anniversary dinner with Karin. Last enjoyment of any of these three activities until I recover from surgery.

Time: 2 hours

Saturday, August 7, 2010

Aug 1-7 -- Rudder Stiffeners

Have been plugging away at this each evening this week. Well, not quite... The pain from the ruptured discs continues, and between medication, not feeling well, and lots of "real work", time spent on the RV was not a lot. And now I have to go in for back surgery on Wednesday, so there will be close to five weeks of no progress coming up.

You can see in the photos that I primed parts, dimpled everything related to the stiffening ribs, and even riveted them to one skin. The other skin is hopefully tomorrow's project.

There are many reports that cracks appear once the plane is in service. These cracks are always around the end of the stiffener closest to the trailing edge, and common wisdom is that ProSeal will help dampen vibration, and therefore reduce flexing that causes cracks. I almost traced the parts onto 0.020 aluminum, instead of using the standard 0.016 skins, because others have also reported that thicker metal solves the problem.

I decided on the ProSeal approach. Purchased an ounce from Van's and put it under each stiffener -- paying particular attention to the ends. For this part of the assembly I tried to be a neatnik, so I used masking tape to mask off areas where I don't want Proseal to find its way onto the skin. I mixed half the Proseal in the bottom of a yogurt cup, then worked as fast as possible in order that the Proseal would not set up before I finished.

As I assemble the skins to the trailing edge, I plan to add additional generous quantities to the skins in order to dampen vibrations. But for now it's only under the stiffeners.

This was the first run at back riveting, too. In one of the photos you can see the cool tape that holds lines of rivets in place. Sure beats picking off the remains of masking tape! I used a flat steel plate underneath the skin, but first I wrapped the edges in tape to prevent scratches. Still managed to rivet one spot with out the plate under it. Fortunately the damage was easy to repair.

I also continued priming everything with NAPA MS 7220 grey. Others pooh-pooh primer; however as the owner of a Luscombe that was built in 1947 without internal primer paint, I am convinced that (a) you need primer for a long-lasting plane, and (b) airplanes stay in service much longer than anyone expects. So I want mine preserved for the first Klingons that visit Earth.

Total time this week: 8 hours.